![]() In addition to a building permit, separate trade permits are typically required if the project involves electrical, plumbing, or mechanical work, regardless of the value of the work to be performed. Building permits for projects over the $30,000 threshold must be pulled by licensed general contractors, with very few exceptions. Many local building departments have increased that amount to $30,000, which is the same dollar threshold that triggers the requirement to have a general contractor's license to perform the work. ![]() In North Carolina, a building permit is required for any construction, installation, repair, replacement, or alteration to a building or real property costing more than $20,000. Solar panel systems are formally known as Solar Photovoltaic Systems ("SPVP"). This led to new guidelines from the relevant North Carolina licensing boards, which attempt to address some of these issues. ![]() ![]() This brought questions and a degree of confusion regarding both licensing and permitting for such projects. JSolar panel systems on residential homes have greatly increased in popularity over the last several years with the boom in renewable energy. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |